Defense News: Navy Accepts Delivery of USNS John Lewis (T-AO 205)

Source: United States Navy

T-AO 205’s delivery follows the completion of Acceptance Trials with the Navy’s Board of Inspection and Survey to test the readiness and capability of the craft and to validate requirements.

“USNS John Lewis will provide much needed capability to the fleet as the primary fuel pipeline at sea,” said John Lighthammer, program manager, Auxiliary and Special Mission Shipbuilding Program Office. “This is the first of a 20-ship class providing the Sailors and merchant mariners another tool to support at-sea operations.”

The new John Lewis-class T-AOs will be operated by Military Sealift Command to provide diesel fuel and lubricating oil, and small quantities of fresh and frozen provisions, stores, and potable water to Navy ships at sea, and jet fuel for aircraft. The new T-AOs will add capacity to the Navy’s Combat Logistics Force and become the cornerstone of the fuel delivery system.

NASSCO is currently in production on USNS Harvey Milk (T-AO 206), USNS Earl Warren (T-AO 207), and USNS Robert F. Kennedy (T-AO 208). The future USNS Lucy Stone (T-AO 209) and USNS Sojourner Truth (T-AO 210) are under contract.

As one of the Defense Department’s largest acquisition organizations, PEO Ships is responsible for executing the development and procurement of all destroyers, amphibious ships, special mission and support ships, boats and craft.